{"product_id":"komatsu-d375a-6r-bulldozer-field-assembly-service-manual-1","title":"Komatsu D375A-6R Bulldozer Field Assembly Service Manual","description":"\u003ch1\u003eKomatsu D375A-6R Bulldozer Field Assembly Service Manual (GEN00164-05)\u003c\/h1\u003e\n\u003cp\u003eFOREWORD\u003cbr\u003eCONTENTS\u003cbr\u003eSPECIFICATIONS\u003cbr\u003ePRECAUTIONS FOR FIELD ASSEMBLY\u003cbr\u003eDISPOSAL OF REMOVED PARTS\u003cbr\u003eASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE\u003cbr\u003eKIT LAYOUT DIAGRAM\u003cbr\u003eTRANSPORTATION\u003cbr\u003eLIST OF TOOLS FOR FIELD ASSEMBLING\u003cbr\u003eTIGHTENING TORQUE\u003cbr\u003eCOATING MATERIALS\u003cbr\u003eSELECTION OF WIRE ROPES USED FOR ASSEMBLY\u003cbr\u003eA. ASSEMBLY OF CHASSIS\u003cbr\u003eA- Installation of Left and Right Track Frames\u003cbr\u003eA- Installation of Travel Pipe\u003cbr\u003eA- Installation of Operator Cab’s Left Handrail\u003cbr\u003eA- Installation of Operator Cab’s Door Stopper and Striker\u003cbr\u003eA- Installation of Rearview Mirror\u003cbr\u003eA- Installation of Handrail\u003cbr\u003eA-- Installation of Step\u003cbr\u003eA-- Installation of Step\u003cbr\u003eA- Installation of Left Side Step\u003cbr\u003eA- Sticking Sheet to Counterweight\u003cbr\u003eA- Installation of Rear View Camera\u003cbr\u003eA- Installation of Counterweight\u003cbr\u003eA- Installation of Step Light\u003cbr\u003eA- Bleeding of Air from Travel Motor\u003cbr\u003eA-- Installation of Travel Piping Cover\u003cbr\u003eA-- Installation of Travel Piping Cover\u003cbr\u003eA- Installation of Travel Motor Guard\u003cbr\u003eA- Testing Track Shoe Tension\u003cbr\u003eA- Check Fuel, Coolant and Oil Levels\u003cbr\u003eB. ASSEMBLING OF WORK EQUIPMENT\u003cbr\u003eB- Assembly of Arm Cylinder\u003cbr\u003eB- Connection of Arm Cylinder Hoses\u003cbr\u003eB- Installation of Boom Cylinder\u003cbr\u003eB- Installation of Boom Cylinder Hoses\u003cbr\u003eB- Installation of Boom Foot Dust Seal\u003cbr\u003eB- Assembly of Boom Assembly\u003cbr\u003eB- Installation of Hoses from Chassis Along Top of Boom\u003cbr\u003eB- Connection of Boom Cylinder Head\u003cbr\u003eB- Installation of Arm Assembly\u003cbr\u003eB- Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder\u003cbr\u003eB- Installation of Bucket\u003cbr\u003eB- Connection of Work Equipment Grease Piping\u003cbr\u003eB- Connection of Work Equipment Wiring\u003cbr\u003eB- Greasing after Assembling Work Equipment\u003cbr\u003eB- Bleeding Air from Work Equipment Circuit\u003cbr\u003eB- Parts to be Touched up After Field Assembly\u003cbr\u003eC. ASSEMBLING OF WORK EQUIPMENT OF LOADING SHOVEL\u003cbr\u003eC- Releasing residual pressure in hydraulic circuit\u003cbr\u003eC- Pulling out boom foot pin and boom cylinder foot pin\u003cbr\u003eC- Installation of boom cylinder foot\u003cbr\u003eC- Installation of boom and arm assembly\u003cbr\u003eC- Installation of boom cylinder hoses\u003cbr\u003eC- Installation of boom cylinder rod pin\u003cbr\u003eC- Installation of boom cylinder\u003cbr\u003eC- Installation of arm cylinder hoses\u003cbr\u003eC- Installation of bucket cylinder\u003cbr\u003eC- Installation of bucket cylinder hoses\u003cbr\u003eC- Installation of connecting hoses between chassis and boom top\u003cbr\u003eC- Installation of bottom dump cylinder hoses\u003cbr\u003eC- Installation of bucket assembly\u003cbr\u003eC- Installation of working lamps\u003cbr\u003eC- Installation of work equipment grease piping\u003cbr\u003eC- Grease after assembling of work equipment\u003cbr\u003eC- Bleeding air from work equipment circuit\u003cbr\u003eC- Checking oil level in hydraulic tank and adding oil\u003cbr\u003eD. ASSEMBLING OF COUNTERWEIGHT REMOVER\u003cbr\u003eD- Sticking Sheet to Counterweight\u003cbr\u003eD- Adjustment of Shims for Counterweight\u003cbr\u003eD- Greasing\u003cbr\u003eD- Installation of Counterweight Remover\u003cbr\u003eD- Installation of Covers\u003cbr\u003eD- Installation of Clamps\u003cbr\u003eD- Installation of Hoses\u003cbr\u003eD- Bleeding Air from Counterweight Remover Circuit\u003cbr\u003eD- Installation of Counterweight\u003cbr\u003eD- Installation of Accessories\u003cbr\u003eD- Check of Operation\u003cbr\u003eM. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY\u003cbr\u003eM- Inspection of Oil Level in Hydraulic Tank and Refill\u003cbr\u003eM- Replacement of Return Filter (Standard Filter to Flushing Filter)\u003cbr\u003eM- Flushing of Hydraulic Circuit\u003cbr\u003eM- Replacement of Return Filter (Flushing Filter to Standard Filter)\u003cbr\u003eM- Failure code\u003cbr\u003eM- Operating Method of Monitoring\u003cbr\u003eFIELD ASSEMBLY INSPECTION REPORT (Backhoe)\u003cbr\u003eFIELD ASSEMBLY INSPECTION REPORT (Loading shovel)\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePages: 275\u003c\/strong\u003e\u003cbr\u003e\u003cstrong\u003eLanguage: English\u003c\/strong\u003e\u003cbr\u003e\u003cstrong\u003eFormat: PDF\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eFast Download Speeds\u003cbr\u003eOnline \u0026amp;amp; Offline Access\u003cbr\u003eAccess PDF Contents \u0026amp;amp; Bookmarks\u003cbr\u003eFull Search Facility\u003cbr\u003ePrint one or all pages of your manual.\u003c\/p\u003e","brand":"ManualKarts","offers":[{"title":"Default Title","offer_id":50460476801302,"sku":null,"price":59.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0908\/4459\/4454\/files\/servicemanualkomatsu_98f9a0af-ca89-4bd9-95b1-63fdc79aa845.jpg?v=1757066614","url":"https:\/\/manualkarts.com\/products\/komatsu-d375a-6r-bulldozer-field-assembly-service-manual-1","provider":"Manualkarts","version":"1.0","type":"link"}