ManualKarts
Komatsu PC600-8R PC600LC-8R Hydraulic Excavator Field Assembly Instruction Service Manual
Komatsu PC600-8R PC600LC-8R Hydraulic Excavator Field Assembly Instruction Service Manual
Couldn't load pickup availability
Komatsu PC600-8R PC600LC-8R Hydraulic Excavator Field Assembly Instruction Service Manual (GEN00065-02)
Specifications……………………………………………………………………………………………………….
Field Assembling ………………………………………………………………………………………………….
Assembling Procedures, Applicable Equipment and Schedule ……………………………………
Kit Layout Diagram……………………………………………………………………………………………….
Transportation………………………………………………………………………………………………………
List of Tools for Field Assembling……………………………………………………………………………
Standard Tightening Torque …………………………………………………………………………………..
A. Assembly of Chassis …………………………………………………………………………………………
A- Installation of Left and Right Track Frames …………………………………………………..
A- Installation of Travel Pipe …………………………………………………………………………..
A- Installation of Operator Cab’s Left Handrail…………………………………………………..
A- Installation of Operator Cab’s Door Stopper and Striker ………………………………..
A- Installation of Rearview Mirror …………………………………………………………………….
A- Installation of Handrail ……………………………………………………………………………….
A- Installation of Step …………………………………………………………………………………….
A- Installation of Left Side Step ……………………………………………………………………….
A- Sticking Sheet to Counterweight………………………………………………………………….
A- Installation of Counterweight ………………………………………………………………………
A- Installation of Step Light …………………………………………………………………………….
A- Installation of Travel Piping Cover……………………………………………………………….
A- Installation of Pre-cleaner…………………………………………………………………………..
A- Testing Track Shoe Tension……………………………………………………………………….
A- Check Fuel, Coolant and Oil Levels …………………………………………………………….
B. Assembling of Work Equipment ………………………………………………………………………….
B- Assembly of Arm Cylinder ………………………………………………………………………….
B- Connection of Arm Cylinder Hoses………………………………………………………………
B- Installation of Boom Cylinder ………………………………………………………………………
B- Assembly of Boom Assembly ……………………………………………………………………..
B- Installation of Boom Cylinder Hoses…………………………………………………………….
B- Installation of Hoses from Chassis Along Top of Boom…………………………………..
B- Connection of Boom Cylinder Head …………………………………………………………….
B- Installation of Arm Assembly ………………………………………………………………………
B- Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder ……….
B- Installation of Bucket …………………………………………………………………………………
B- Connection of Work Equipment Grease Piping ……………………………………………..
B- Connection of Work Equipment Wiring…………………………………………………………
B- Greasing after Assembling Work Equipment…………………………………………………
B- Bleeding Air from Work Equipment Circuit ……………………………………………………
B- Parts to be Touched up After Field Assembly ……………………………………………….
M. Procedure for Inspection and Maintenance after Completion of Assembly ……………….
M- Inspection of Oil Level in Hydraulic Tank and Refill ……………………………………….
M- Replacement of Return Filter (Standard Filter to Flushing Filter)……………………..
M- Flushing of Hydraulic Circuit ………………………………………………………………………
M- Error Code……………………………………………………………………………………………….
M- Operating Method of Monitoring………………………………………………………………….
C. Assembly of Loading Shovel Work Equipment……………………………………………………
C- Releasing Residual Pressure in Hydraulic Circuit………………………………………..
C- Pulling Out Boom Foot Pin and Boom Cylinder Foot Pin………………………………
C- Installation of Boom Cylinder Foot …………………………………………………………….
C- Installation of Boom and Arm Assembly …………………………………………………….
C- Installation of Boom Cylinder Hoses ………………………………………………………….
C- Installation of Boom Cylinder Rod Pin………………………………………………………..
C- Installation of Boom Cylinder ……………………………………………………………………
C- Installation of Arm Cylinder Hoses …………………………………………………………….
C- Installation of Bucket Cylinder…………………………………………………………………..
C- Installation of Bucket Cylinder Hose ………………………………………………………….
C- Installation of Connecting Hoses between Chassis and Boom Top ……………….
C- Installation of Bottom Dump Cylinder Hoses ………………………………………………
C- Installation of Bucket Assembly ………………………………………………………………..
C- Installation of Working Lamps…………………………………………………………………..
C- Installation of Work Equipment Grease Piping ……………………………………………
C- Greasing After Assembling of Work Equipment…………………………………………..
C- Bleeding Air from Work Equipment Circuit………………………………………………….
C- Checking Oil Level in Hydraulic Tank and Adding Oil…………………………………..
C- Replacement of Return Filter (Standard Filter to Flushing Filter) …………………..
C- Flushing of Hydraulic Circuit …………………………………………………………………….
Field Assembly Inspection Report (Backhoe)
Field Assembly Inspection Report (Loading Shovel)
Pages: 172
Language: English
Format: PDF
Fast Download Speeds
Online & Offline Access
Access PDF Contents & Bookmarks
Full Search Facility
Print one or all pages of your manual.
Share
